Hub Site Checklist

Nana Bambi's โ€” Document Viewer

โ† Library โฌ‡ Download
Viewing: NanaBambis_HubSite_Checklist.docx โ€” opened in-browser for easy review. Use the download button above if you need the original file.

Pahinga ยท Hinga ยท Dahan-dahan

BAMBI'S PLACE

Hub Site Evaluation Checklist

Assessing candidate sites for the Nana Bambi's commercial hub

Use this checklist for every site you look at. Fill it in on the spot. Do not rely on memory. A site that looks perfect on a drive-past can fail three of these criteria on closer inspection.

The hub site is the most important decision of Year 1.

Requirements: Road-facing on or near the Andaya Highway between Ragay and GRS. Enough space for containers, cold chain, market, and delivery dispatch. Low flood risk. Clean title. Accessible lease at a viable price.

Do not settle. Do not rush. But do not let Month 4 pass without a decision.

Site Details โ€” Fill In On Inspection

Field

Notes

Site address / barangay

Owner name

Contact (owner or agent)

Date inspected

Inspected by

GPS coordinates

Asking lease price (per month)

Asking purchase price (if applicable)

Lease term available

Section 1 โ€” Location & Access

โœ“

Location & Access

โ˜

Andaya Highway frontage

Does the site have direct road frontage on the Andaya Highway? Or within 200m with clear access road?

โ˜

Road condition

Is the access road sealed and passable year-round โ€” including wet season? Can a loaded delivery truck access it?

โ˜

Visibility

Is the site visible from passing traffic? Can signage be seen from 100m in each direction?

โ˜

Distance from Ragay town

How far from Ragay poblacion? Under 5km is ideal. Note the actual distance.

โ˜

Distance from GRS

How far from General Reyes Santos? This is the other end of the delivery corridor.

โ˜

Parking / turning space

Is there space for vehicles to pull in, turn around, and load/unload without blocking the highway?

โ˜

Electricity connection

Is there an existing CASURECO power connection on the site or immediately adjacent?

โ˜

Water supply

Existing supply (well, municipal) or would this need to be established? Note source and reliability.

Section 2 โ€” Site Size & Suitability

โœ“

Size & Suitability

โ˜

Total area

Measure or estimate the total usable area in square metres. Minimum viable: 500 sqm. Ideal: 1,000+ sqm.

โ˜

Level ground

Is the ground reasonably flat, or does it require significant earthworks? Estimate cost if levelling needed.

โ˜

Container placement

Can at least 3 x 40ft containers be placed in a U-shape configuration with working space in front?

โ˜

Cold chain space

Is there room for a reefer container separate from or adjacent to the main structure?

โ˜

Market/retail frontage

Is there a natural front-of-house area for a market stall, covered display, or retail counter?

โ˜

Delivery staging area

Is there a shaded area where delivery crates can be staged and sorted before dispatch?

โ˜

Future expansion

Is there room to grow โ€” second wing, upper level, additional containers โ€” without hitting a boundary?

โ˜

Drainage

Does water drain away from the site or does it pool? Check during or after rain if possible.

Section 3 โ€” Flood & Natural Hazard Risk

Bicol is one of the most typhoon-affected regions in the Philippines. Flood risk at the hub site is a critical assessment โ€” not a box-ticking exercise. A flooded hub site can destroy inventory, equipment, and cold chain in a single event.

โœ“

Flood & Hazard Risk

โ˜

Flood history

Ask locals and the barangay captain: has this site flooded in the past 10 years? If yes โ€” how often and how deep?

โ˜

Proximity to river or creek

Is there a waterway within 300m? Note name and approximate distance. Check flood inundation maps.

โ˜

Elevation above road

Is the site elevated above the road level (good) or below it (risk of road runoff entering the site)?

โ˜

PHIVOLCS hazard check

Check the Mines and Geosciences Bureau / PHIVOLCS hazard maps for liquefaction and landslide risk at this location.

โ˜

Typhoon exposure

Is the site in an open area exposed to prevailing typhoon winds, or does it have natural windbreaks โ€” hills, tree lines, existing structures?

โ˜

Storm surge risk

Is the site within 2km of the coast or a tidal river? If yes, storm surge risk must be assessed before proceeding.

Section 4 โ€” Legal & Title

Do not sign anything, pay anything, or begin any work on a site until the title has been reviewed by a lawyer. Title disputes are common and can be catastrophic.

โœ“

Legal & Title

โ˜

Title type

Is this a Torrens title (clean registered title) or an untitled lot? Torrens title is strongly preferred.

โ˜

Owner confirmed

Has the owner's identity been verified against the title document? Is the person you are talking to actually the registered owner?

โ˜

No encumbrances

Are there mortgages, liens, or court orders registered against the title? Ask the owner and verify with the Register of Deeds.

โ˜

No boundary disputes

Are the boundaries clear and undisputed by neighbouring landowners?

โ˜

Zoning classification

Is the land classified for commercial or mixed use? Agricultural land may require conversion before commercial use โ€” note and confirm.

โ˜

CARP coverage

Is the land covered by Comprehensive Agrarian Reform? If so, conversion and transfer restrictions apply.

โ˜

Lease terms acceptable

Is the owner willing to offer a lease of at least 5 years with renewal option? Shorter terms are a risk for infrastructure investment.

โ˜

Lawyer review

Has the title been reviewed by a Philippine lawyer before any commitment is made?

Section 5 โ€” Community & Context

โœ“

Community & Context

โ˜

Barangay relationship

Is the local barangay captain aware of and supportive of the intended use? Early community buy-in reduces future friction.

โ˜

Neighbouring uses

What are the adjacent land uses โ€” residential, agricultural, commercial? Any uses that could conflict (piggery smell, noise)?

โ˜

Labour availability

Are there people in the immediate barangay who could work at the hub? Proximity to workforce matters.

โ˜

Competitor proximity

Are there existing feeds stores, market operations, or similar businesses within 2km? Note and assess the competitive landscape.

โ˜

Farmer catchment

How many active farming households are within a 10km radius? This is the feeds customer base.

Section 6 โ€” Scoring Summary

After completing each section, score the site against the criteria below. A site must score at least 70 points to proceed to legal review.

Category

Max Points

Your Score

Notes

Location & Access

Highway frontage, visibility, utilities

Site Size & Suitability

Space, drainage, layout potential

Flood & Hazard Risk

Most critical category โ€” double weight

Legal & Title

Clean title, acceptable terms

Community & Context

Barangay support, farmer catchment

TOTAL

70+ required to proceed to lawyer review

Decision

Score Range

Action

โœ“ Proceed

85โ€“100

Take to lawyer immediately. Make offer on lease terms. Do not delay.

โœ“ Proceed with conditions

70โ€“84

Proceed to legal review but note the weak areas. Negotiate lease terms to address risks.

โš  Borderline

55โ€“69

Do not proceed unless no better option exists. Document the risks clearly before committing.

โœ— Reject

Below 55

Move on. Do not let momentum or cost-of-search pressure you into a poor site decision.

Live with the land, not on it. ยท Makiisa sa kalikasan.

Nana Bambi's ยท Ragay, Camarines Sur, Bicol ยท March 2026